  • P1060302-1

    Helsingborg, Sweden | Trolley wheel alignment

    December 2013. The project in Helsingborg, Sweden, consisted of the exchange of all four trolley wheels, followed by a complete alignment procedure. Driving by service van from The Netherlands, all tools, jacks and alignment equipment was shipped to Sweden for this short notice service intervention.

  • Zhen Hua 26, 14-1-2014, nr.8

    Rotterdam, The Netherlands | Consultancy services ECT Delta Terminal

    2012-2013. Langeveld Project Management B.V. has delivered consultancy engineering services in the procurement process of 5 Super Post Panamax cranes for ECT Delta in Rotterdam, The Netherlands. Besides a complete check of all the calculations and drawings of the Chinese crane builder ZPMC, a separate calculation model was made of the cranes, enabling a full check of the steel structures. The cranes were built and shipped fully erect from Shanghai to Rotterdam.

  • P1060648

    Cotonou, Benin | Trolley wheel alignment

    November 2013. Trolley alignment services were provided on site in Cotonou, Benin, on two newly delivered container cranes for the Bolloré-Group, Africa Logistics.

  • P1060558

    Manzanillo, Mexico | Crane weight measurement

    October 2013. The weight measurement of a container crane is of paramount importance to many parties. Both the crane builder as well as the operator benefit from the insight provided from an accurate weight measurement. This insight varies from the actual load on the quay rails or e.g. the stability under storm conditions to even the fatigue load in normal operation. From the weight measurement, also the location of the Center of Gravity in the X-Y plane is calculated.

    In order to serve the involved parties, the crane weight of the newly delivered Ship to Shore container cranes was measured at the ICTSI terminal in Manzanillo, Mexico. Flying in with a full set of weight measurement equipment from The Netherlands, Langeveld has measured the weight of the cranes in all operational conditions.

  • IMG_1075 (Large)_V2

    Point Noire, Congo | Interim project management

    April 2013. Interim project management services were delivered for the commissioning of two newly delivered Kalmar cranes to Congo Terminal, Pointe Noire. After the cranes arrived fully erected from China, the final commissioning was finalized on site in Congo. The delivered services comprised of the commissioning process, hand-over testing and load testing, witnessed by the representative of the Bolloré-group.